铺设丙烯酸球场前,需要对场地基础进行处理,铺设运动场地面层的场地基础主要是水泥基础和沥青基础这两种,一般做丙烯酸球场的大多是水泥地,那水泥基础在施工前又该做哪些处理呢?
Laid acrylic stadium before, need to deal withground base, laying of sports venues based mainly cement base andthe asphalt road surface of the ground, the two generally doacrylic stadium is mostly concrete, the concrete foundation inconstruction and what to do before the treatment?
丙烯酸球场施工
在施工丙烯酸球场前先检查水泥地是否完好干净,看看是否有松动的,破裂的,空心的地方,在检查到各种问题后需要进行处理,方便施工后不会造成影响,对不好的位置进行修补清洁。
Check concrete in the construction of acrylicstadium before clean and see if there is a loose, broken, hollowplace, need to process after checking to all sorts of problems,will not affect after convenient construction, to repair thecleaning bad position.
待场地能够进行塑胶篮球场施工后进行下一步处理工作。将场地周围清洁干净,接着需要对场地进行打磨,去掉表面附着的污物等,将场地打磨平整,Zui后对场地进行清洗,等水泥场地完全干燥后开始铺设丙烯酸球场。
After the site can be constructed, the next stepwill be handled. Clean around the field, and then need to grind thesite, remove the surface of dirt, such as the field sand, finally,the site cleaning, such as cement began laying acrylic stadiumafter completely dry.
运动场预制型橡胶跑道每平方米价格咨询优正体育,材料和施工价格有专业报价详情,工厂直销,价格优惠。